Copyright © Pacific Water Treatment Engineering Co., Ltd. 苏ICP备08016215号 Powered by www.300.cn [Manager]
Hohhot Jinqiao WWTP project passed the acceptance
Page view
[Abstract]:
It is understood that the Hohhot Jinqiao WWTP covers an area of 10.4 hectares, the treatment scale is 40,000 m3/d in the near future, and the long-term scale reaches 80,000 m3/d. The pipe network project matches the amount of sewage; the Jinqiao WWTP also includes refining The plant is treated with high salt water and has a scale of 31.50m3/h.
Recently, the project of Hohhot Jinqiao Wastewater Treatment Plant under construction by Pacific Water Treatment passed the acceptance test. It is reported that the project content passed the acceptance is the second bidding section of the equipment procurement and installation project of Jinqiao Sewage Treatment Plant and Pipeline Network Project.
It is understood that the Hohhot Jinqiao WWTP covers an area of 10.4 hectares, the treatment scale is 40,000 m3/d in the near future, and the long-term scale reaches 80,000 m3/d. The pipe network project matches the amount of sewage; the Jinqiao WWTP also includes refining The plant is treated with high salt water and has a scale of 31.50m3/h.
Previous article:
Hefei No. 7 Water Plant Project passed the acceptance