Search

中文      English

Copyright © Pacific Water Treatment Engineering Co., Ltd. 苏ICP备08016215号  Powered by www.300.cn  [Manager]

Xiaoshan East Regional Water Supply Plant

Page view
[Abstract]:
Xiaoshan East Regional Water Supply Plant

Project Name: Phase I Automatic Control Project of Water Supply (Jiangdong Water Plant) in the Eastern Area of Xiaoshan, Zhejiang Province

Project Profile: The first phase of the water supply (Jiangdong Water Plant) project in the eastern part of Xiaoshan, Zhejiang Province was approved by the Zhejiang Development and Reform Commission, Zhejiang Development Design [2007] No. 102, and has been listed as a key construction project in Zhejiang Province. The construction scale of the project is 1 million tons/day for the long-term plan, 300,000 tons/day for the first phase, 26 kilometers for the raw water pipeline, 1 million tons/day for the civil works, 300,000 tons/day for the equipment, 1 for the water intake, and the total investment. It is about 900 million yuan. The construction address is located in Jingjiang Town, Xiaoshan District, and was completed in August 2011. The first phase of the Xiaoshan East Regional Water Supply (Jiangdong Water Plant) project is controlled by Pacific Water Treatment Engineering Co., Ltd.

Treatment scale: 300,000 tons/day in the first phase

Scope of services: automatic monitoring system, low-voltage distribution system, chlorination, twisting, alkali addition, potassium permanganate, activated carbon, blower, air compressor, pneumatic valve, sludge drying, security system, etc. .

Highlights of the project: key projects in Zhejiang Province, large-scale regional water supply projects.

 

Xiaoshan East Regional Water Supply Plant