Copyright © Pacific Water Treatment Engineering Co., Ltd. 苏ICP备08016215号 Powered by www.300.cn [Manager]
Ningbo Maojiaping Water Plant Project
Project Name: Ningbo Maojiaping Water Plant Project
Project Overview: The Maojiaping Water Plant is named after the Maojiaping Reservoir in the south. It is estimated to have a total investment of 450 million yuan and a designed daily water production capacity of 500,000 tons. The water plant will be built on a hillside 52 meters high on the northwest side of Meiyuan Village, using water level and gravity to achieve water supply. The water plant cites the high-quality raw water of the Suikou Reservoir and supplements it with high-quality raw water from the Zhougongzhai Reservoir. After strengthening coagulation, sedimentation and filtration, it mainly supplies water to the urban and rural areas of Zhangzhou, Haishu and Jiangbei, and delivers water with the newly built Dongqian Lake Water Plant. The pipeline is connected to the Ningbo urban water supply ring network.
Project scale: 500,000 tons / day
Service scope: engineering package
Project highlights: World Bank loans, large-scale modern water plant contracting project.