Hangzhou Second Landfill Wastewater Treatment Plant Reconstruction Project

Page view
[Abstract]:
Project Name: Reconstruction Project of Waste Treatment Plant of Hangzhou Second Landfill Site

Project Overview: Hangzhou No. 2 Landfill Site is located in Qinglongwu between Shitang Village, Banshan Town, North Hangzhou, and Shuihongmiao Village, Chongxian Town, Yuhang District. The landfill is north of Tianziling and south of Huanghe Mountain. It is bordered by the main peak of the Mid-Levels in the east, and the tributary of the canal along the mountain. It is 900 meters away from National Highway 320 and 17 kilometers away from Wulin Gate. The sewage treatment plant is located on the west side of the second landfill in Hangzhou, covering an area of 17.69 mu. The existing treatment process has not adapted to the requirements of the current new standard “Standard for Pollution Control of Domestic Waste Landfills” (GB16889-2008), and it must be modified. The total land area of the Hangzhou Waste Landfill Wastewater Treatment Plant Reconstruction Project is 31.75 mu.

Project scale: 1000 tons / day

Service scope: automatic control and system integration
Project Name: Reconstruction Project of Waste Treatment Plant of Hangzhou Second Landfill Site
 
Project Overview: Hangzhou No. 2 Landfill Site is located in Qinglongwu between Shitang Village, Banshan Town, North Hangzhou, and Shuihongmiao Village, Chongxian Town, Yuhang District. The landfill is north of Tianziling and south of Huanghe Mountain. It is bordered by the main peak of the Mid-Levels in the east, and the tributary of the canal along the mountain. It is 900 meters away from National Highway 320 and 17 kilometers away from Wulin Gate. The sewage treatment plant is located on the west side of the second landfill in Hangzhou, covering an area of 17.69 mu. The existing treatment process has not adapted to the requirements of the current new standard “Standard for Pollution Control of Domestic Waste Landfills” (GB16889-2008), and it must be modified. The total land area of the Hangzhou Waste Landfill Wastewater Treatment Plant Reconstruction Project is 31.75 mu.
 
Project scale: 1000 tons / day
 
Service scope: automatic control and system integration

 