Beijing Tenth Water Plant A Plant Equipment Supply Contractor Project

Page view
[Abstract]:
Beijing Tenth Water Plant A Plant Equipment Supply Contractor Project

Project Name: Beijing Water Source Ten Plant Project Equipment Supply Contract Project

Project size: 500,000 tons / day

Project introduction: Beijing No. 10 Water Plant A Plant Project is the first municipal water supply facility in Beijing that adopts the international bidding BOT model. It is also the largest water supply BOT project in China, and is invested by Beijing Anling Technology Co., Ltd. Build and run management. The scale of the project is 500,000 m3/d. The site is located in the Changyingying area of Beijing's East Fifth Ring Road. The total area is about 180 mu, and the average elevation of the ground design of the site is 29.5 m. According to reports, the total investment of the project of the tenth water plant A plant is estimated to be about 2.3 billion yuan, and the design processing capacity is 500,000 cubic meters per day. The main water supply pipelines and water purification plants are mainly constructed to deal with the raw water of the South-to-North Water Diversion Project and the Miyun Reservoir. A main water plant.

Service scope: equipment supply package

Project Highlights: China's largest water supply BOT project